2023-05-28 09:55:08 | News | ID : 3194 | Visit : 199
According to the public relations report of the Soil Mechanics and Technical Laboratory, Mohammad Reza Jafari, Director General of the Soil Mechanics and Technical Laboratory, said: The Jask-Karvan axis project is located along the east-west corridor of this province, and the soil mechanics and technical laboratory of this province is equipped with a laboratory located in The project has carried out the required tests to improve its quality by using technical and expert forces as well as using unique and updated equipment according to domestic and international standards.
Jafari pointed out that more than 6,000 tests were carried out to improve the quality of this project and added: Hormozgan Province Soil Mechanics and Technical Laboratory has successfully registered various tests in the field of quality control of soil, concrete, bitumen and asphalt and played an influential role in To improve quality, increase lifespan and reduce costs in this project.
He added: The 126-kilometer coast line project from Jask to Karvan has been implemented with the aim of improving and converting the communication road of the Makran beaches to the main road, as well as reducing the travel time and reducing road hazards between Hormozgan and Sistan and Baluchistan provinces.
The Director General of Hormozgan Soil Mechanics and Technical Laboratory continued: One of the goals of this project is access to the border town of Gowater in the southwestern tip of Sistan and Baluchistan province and use of the country's export capacities.